Project 03BRIDGES
RiversideBridge
Trishuli Corridor, Nepal2024Structural Engineer
Overview
A 180m three-span river crossing engineered for scour, flood and seismic displacement.
A three-span prestressed girder crossing over a fast-moving mountain river. Pier foundations were taken to bedrock through well caissons after a scour study revised design depths by 3.2m. Bearings and expansion joints were selected to absorb longitudinal seismic displacement without transferring demand to the abutments.
- Scour-informed caisson foundations to bedrock
- Post-tensioned girders cast on site
- Zero deck closure during monsoon season
SAP2000Civil 3DAutoCADSTAAD.Pro
Engineering scope
- 01Structural Analysis
- 02Structural Design
- 03Construction Supervision
- 04Site Coordination
Gallery

Explore the structure
Rotate — Zoom — ResetSTRUCTURAL
Procedural structural model
Structure breakdown
Use Explode structure in the viewer to separate the assembly and follow the load path from roof to ground.
- 01RoofWeatherproofing and plant loads
- 02FloorsSlabs distributing live load
- 03BeamsSpanning members in bending
- 04ColumnsVertical load path in compression
- 05FoundationLoad transferred to ground
Next projectHighway Expansion