Project 06INFRASTRUCTURE
UrbanInfrastructureProject
Kathmandu, Nepal2022Project Engineer
Overview
A 4.2km corridor upgrade combining storm drainage, an underpass and pedestrian infrastructure.
An urban corridor upgrade combining 4.2km of RCC storm drainage channels, a vehicular underpass and continuous pedestrian infrastructure. Hydraulic capacity was sized against a 25-year return-period event with utility diversions coordinated across four service providers.
- 25-year storm design capacity
- Utility diversions across four providers
- Continuous pedestrian route along 4.2km
Civil 3DAutoCADPrimavera
Engineering scope
- 01Infrastructure Design
- 02Site Coordination
- 03Quantity Estimation
Gallery

Next projectKathmandu Commercial Tower